Integrated Well Plug & Abandonment Solution

Surface Flowback Package
June 14, 2017
Tubular Services
June 14, 2017

After a well's productive life, it is usually plugged and abandoned with cement and heavy mud.

Vantage provides a state of the art for rock to rock P&A solution using the Perf-Wash-Cement (PWC®) technique. PWC® is developed as an alternative single trip P&A solutions to conventional section milling. Wash clean behind casing but good cement and spray jet cement slurry through perforated hole and forcing more cement into annulus by creating flow resistance. No milling, no swarf, no pulling, no BOP damage, less time.

Applicable for fixing well with sustained annulus pressure (SAP).